Dantherm DanX 2HP System & Custom Air Distribution Upgrade
Zenith Ventilation recently completed a specialised mechanical services installation for P3 Recovery in Moore Park, delivering a fully integrated air-handling and dehumidification solution tailored for their new indoor wellness pool facility. The project required precise environmental control, high efficiency, and a durable system capable of performing reliably in an aquatic environment, making the DANTHERM DanX 2HP the ideal choice.
Dantherm DanX 2HP: Purpose-Built for Aquatic Spaces
The centrepiece of the installation is the DanX 2HP air-handling and dehumidification unit, selected specifically for its:
-
High energy efficiency
-
Reliable, continuous-duty performance
-
Precision temperature and humidity control
-
Proven suitability for indoor pools and wellness facilities
This system ensures the P3 Recovery pool hall maintains a stable, comfortable, and healthy indoor climate, even under fluctuating occupancy and activity levels.
Mechanical Services Installation
The project included installation of ventilation infrastructure.
Ductwork & Air Distribution
In the plant room, Zenith Ventilation installed galvanised steel spiral ductwork, externally lagged with high-performance thermal insulation.
This protects against energy loss, improves system efficiency, and ensures long-term durability in a high-moisture environment.
Custom Aerotextile Fabric Duct System
Inside the indoor swimming pool facility, a bespoke aerotextile fabric duct, custom manufactured in France, was suspended along the central axis of the space.
This specialised ductwork was engineered to deliver:
-
Uniform and consistent airflow across the pool hall
-
Balanced air dispersion to both sides of the wellness pool
-
Condensation prevention on interior surfaces
-
Silent, draft-free air movement ideal for calm recovery spaces
The result is superior air quality and comfort for all occupants, with performance tailored to the unique demands of a hydrotherapy environment.
Environmental Control Objectives
The DanX 2HP system is configured to achieve precise and stable climate conditions, with core objectives including:
-
Occupant comfort through steady temperature and controlled humidity
-
Operational efficiency, reducing long-term running costs
-
Building envelope protection, with moisture mitigation strategies to prevent corrosion, mould, and structural degradation
Together, these elements create a controlled, energy-efficient indoor environment that supports both wellness activities and the longevity of the facility.
Delivering Performance for P3 Recovery
This project demonstrates Zenith Ventilation’s capability in delivering specialised mechanical solutions for high-humidity, performance-critical environments.
By combining Dantherm technology, custom ductwork, and carefully engineered air distribution, we’ve provided P3 Recovery with a reliable, efficient and future-proo